Project 2024

PT Tata Metal Lestari 1 MWp Solar Rooftop Project

Tata Metal Lestari

0b6d52962e2decd6b9b6b04685884270 - partnersurya hadir sebagai mitra epc & o&m

Capacity

1 MWp

Solar Rooftop • Industrial Project • 2024

PT Tata Metal Lestari 1 MWp On-Grid Solar Rooftop Project

Completed in 2024, the PT Tata Metal Lestari 1 MWp On-Grid Solar Rooftop Project in Purwakarta, West Java marks another significant step toward sustainable industrial manufacturing in Indonesia. By integrating a rooftop solar photovoltaic (PV) system into its production facility, PT Tata Metal Lestari reinforces its commitment to energy efficiency, operational sustainability, and environmental responsibility.

📍 Purwakarta, West Java, Indonesia ⚡ Installed Capacity: 1 MWp 📅 Completed: 2024 🏭 Application: Industrial Manufacturing
Project Summary

The PT Tata Metal Lestari Solar Rooftop Project utilizes a 1 MWp on-grid solar PV system to generate clean electricity that supports daily manufacturing operations. The installation helps reduce reliance on conventional electricity while improving long-term operational efficiency and contributing to Indonesia’s renewable energy transition.

As one of Indonesia’s leading steel building material manufacturers, PT Tata Metal Lestari continues to embrace renewable energy technologies to support sustainable industrial growth. The rooftop solar installation maximizes available roof space, producing renewable electricity without disrupting factory operations.

The 1 MWp solar power system contributes to lowering electricity costs, reducing greenhouse gas emissions, and strengthening the company’s Environmental, Social, and Governance (ESG) commitments. The project demonstrates how industrial facilities can successfully integrate renewable energy into their production processes while supporting national decarbonization initiatives.

☀️

1 MWp Solar PV System

A high-efficiency on-grid rooftop solar installation designed to provide reliable renewable electricity for industrial manufacturing.

🌿

Clean Energy Transition

Supports carbon emission reduction while improving sustainability performance and environmental responsibility.

🏭

Industrial Energy Efficiency

Helps optimize electricity consumption, reduce operating costs, and enhance long-term energy resilience.

Project Overview

  • Project Name: PT Tata Metal Lestari Solar Rooftop Project
  • Location: Purwakarta, West Java, Indonesia
  • Completion Year: 2024
  • Installed Capacity: 1 MWp
  • System Type: On-Grid Solar PV
  • Application: Industrial Manufacturing Facility
  • Industry: Steel Building Materials Manufacturing
  • Key Benefits: Renewable Energy Generation, Lower Electricity Costs, Reduced Carbon Emissions, Improved Energy Efficiency, ESG Support

Supporting Sustainable Manufacturing in Indonesia

The PT Tata Metal Lestari 1 MWp Solar Rooftop Project demonstrates how industrial manufacturers can adopt clean energy technologies to improve operational efficiency while supporting Indonesia’s renewable energy roadmap. By utilizing solar energy, the company strengthens its commitment to sustainable manufacturing, lower carbon emissions, and long-term environmental stewardship.

Looking for an Industrial Solar Rooftop Solution?

Our engineering team delivers end-to-end commercial and industrial solar PV solutions, including feasibility studies, engineering design, procurement, installation, commissioning, and long-term maintenance services across Indonesia.

Contact Our Team