Project 2023

Morowali Hybrid Solar Power Plant 300 kWp

Sesna

A4401ca5da85aa423ac867346fcc5c9f - partnersurya hadir sebagai mitra epc & o&m

Capacity

300 KWp

Scope

EPC

Location

Central Sulawesi

Hybrid Solar PV • 2023

Morowali Hybrid Solar Power Plant – 300 kWp

Completed in 2023, the 300 kWp Hybrid Solar Power Plant in Morowali, Central Sulawesi delivers reliable renewable electricity through the integration of solar photovoltaic (PV) technology and battery energy storage, supporting sustainable industrial operations and long-term energy resilience.

Project Overview

The Morowali Hybrid Solar Power Plant combines a 300 kWp solar photovoltaic system with an advanced battery energy storage solution to provide a stable and efficient power supply. The hybrid configuration maximizes solar energy utilization while ensuring reliable electricity availability during periods of low solar irradiation or increased energy demand.

☀️

300 kWp

Installed hybrid solar photovoltaic capacity.

🔋

Hybrid System

Integrated battery storage for enhanced power reliability.

📍

Central Sulawesi

Located in Morowali, one of Indonesia’s major industrial regions.

🌱

Sustainability

Supporting renewable energy adoption and carbon emission reduction.

Project Details

  • Project Name: Morowali Hybrid Solar Power Plant
  • Project Type: Hybrid Solar Power Plant (PLTS Hybrid)
  • Installed Capacity: 300 kWp
  • Location: Morowali, Central Sulawesi, Indonesia
  • Completion Year: 2023
  • Application: Industrial Energy Supply
  • Technology: Solar Photovoltaic (PV) + Battery Energy Storage System (BESS)
  • System Configuration: Hybrid Solar PV with Battery Storage
  • Key Benefits: Reliable Renewable Energy, Improved Energy Security, Lower Carbon Emissions, Reduced Grid Dependency, Higher Operational Efficiency

Reliable Hybrid Renewable Energy for Industrial Operations

The Morowali Hybrid Solar Power Plant demonstrates how hybrid renewable energy systems can provide dependable electricity for industrial facilities located in areas with high energy demand. By combining solar PV generation with battery energy storage, the project ensures a more stable power supply while maximizing the utilization of renewable energy resources.

This hybrid solar solution supports Indonesia’s energy transition by improving operational efficiency, reducing reliance on conventional electricity sources, and helping industrial companies achieve their Environmental, Social, and Governance (ESG) objectives.

Looking for a Hybrid Solar Power Plant Solution?

Our engineering team delivers complete Engineering, Procurement, Construction (EPC), commissioning, and maintenance services for hybrid solar power plants, battery energy storage systems, and commercial & industrial solar PV projects across Indonesia.

Consult Our Hybrid Solar Experts