Karawang ADM – On-Grid Solar PV 3.2 MWp
Completed in 2024, the Karawang ADM Solar PV Project demonstrates a strong commitment to renewable energy adoption in Indonesia’s manufacturing sector. Acting as the EPC contractor under SESNA Group, the project delivers a 3.2 MWp on-grid solar power system designed to support sustainable industrial operations.
Installed Capacity
Large-scale rooftop solar photovoltaic system for industrial energy generation.
Project Location
Located in one of Indonesia’s major industrial manufacturing hubs.
Solar System
Integrated with the utility grid for optimized energy utilization.
EPC Contractor
Engineering, Procurement, and Construction delivered by SESNA Group.
Project Overview
In 2024, Karawang ADM strengthened its sustainability initiatives through the implementation of a 3.2 MWp On-Grid Solar PV System. Developed with SESNA Group as the EPC contractor, the project enables the facility to generate clean electricity directly from solar energy while reducing dependence on conventional power sources.
The solar installation supplies renewable energy to support operational activities across the facility, contributing to improved energy efficiency, reduced operational costs, and long-term environmental sustainability goals.
Supporting Indonesia’s Renewable Energy Transition
As industries across Indonesia move toward cleaner energy solutions, the Karawang ADM Solar Project represents a significant step in accelerating renewable energy adoption within the manufacturing sector. By utilizing solar power, the facility actively contributes to reducing greenhouse gas emissions and supporting national sustainability targets.
The implementation of this on-grid solar PV system also demonstrates how industrial facilities can integrate renewable energy into daily operations without disrupting productivity, while improving long-term energy resilience.
Project Highlights
☀ Large-Scale Solar Generation
3.2 MWp of installed solar capacity delivering renewable electricity for industrial operations.
⚡ Grid-Connected System
On-grid configuration maximizes solar energy utilization while maintaining reliable power availability.
🌱 Sustainability Commitment
Supports carbon emission reduction and strengthens ESG implementation.
🏭 Industrial Application
Designed to support large-scale manufacturing and operational energy requirements.
Project Timeline
Engineering & Design
Site assessment, structural evaluation, and solar PV system design tailored to industrial requirements.
Procurement & Installation
Supply and installation of photovoltaic modules, mounting systems, inverters, and electrical infrastructure.
Testing & Commissioning
Performance verification, safety testing, and synchronization with the utility grid.
Commercial Operation
The solar power system began supplying renewable electricity to support facility operations in 2024.
Project Facts
- Project Name: Karawang ADM On-Grid Solar PV
- Location: Karawang, West Java, Indonesia
- Installed Capacity: 3.2 MWp
- Year Completed: 2024
- System Type: On-Grid Solar PV System
- EPC Contractor: SESNA Group
- Application: Industrial Manufacturing Facility
- Benefits: Renewable Energy Generation, Reduced Carbon Emissions, Improved Energy Efficiency, Lower Electricity Costs
Looking for an Industrial Solar PV EPC Partner?
From feasibility studies and engineering design to installation and commissioning, our team delivers reliable solar energy solutions for industrial and commercial facilities across Indonesia.
Talk to Our Solar Experts